Kapooka High Pressure Watermain
PROJECT DESCRIPTION
Kapooka High Pressure Watermain
ICG Fleming were engaged by Joss Construction to supply and install a new 1.3km DN180 HDPE pipeline from an existing pump house to the water supply tanks on top of the hill at Kapooka Army Base. The key purpose of this project was to replace the existing non-operational auxiliary water supply for the base.
The route included numerous service crossings which were survey, positively identified via hydrovac, and safely crossed.
CLIENT
Joss Construction
LOCATION
Wagga Wagga, NSW